Starry Sky Dynamics Aerospace has completed multiple key ground tests for the Ceres II launch vehicle.

Jin10 Data reported on August 12th that Galaxy Dynamics Aerospace announced today the completion of several key ground tests for the Ceres-2 launch vehicle in the recent period, including electrical system integration matching tests, control system hardware-in-the-loop simulation tests, full system thermal tests for the attitude control power system, joint tests for the first stage engine, joint tests for the second stage engine, static tests for the fairing, fairing separation tests, and joint drills between the launch vehicle and the rocket. The countdown for the maiden flight of the Ceres-2 launch vehicle has begun, which will carry 6 commercial satellites and 2 non-separable payloads, with a total payload exceeding 1 ton.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate app
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)