📢 Gate Square #Creator Campaign Phase 2# is officially live!
Join the ZKWASM event series, share your insights, and win a share of 4,000 $ZKWASM!
As a pioneer in zk-based public chains, ZKWASM is now being prominently promoted on the Gate platform!
Three major campaigns are launching simultaneously: Launchpool subscription, CandyDrop airdrop, and Alpha exclusive trading — don’t miss out!
🎨 Campaign 1: Post on Gate Square and win content rewards
📅 Time: July 25, 22:00 – July 29, 22:00 (UTC+8)
📌 How to participate:
Post original content (at least 100 words) on Gate Square related to
Celo Mainnet migration to Ethereum Layer 2 has been launched, block production is paused.
According to the Gate.io News bot and TheBlock report, the Celo Mainnet has begun executing its migration plan from Layer 1 to Ethereum Layer 2, and block production is currently paused. Once the migration is complete, Celo will operate on the Ethereum Layer 2 level, featuring native Ethereum cross-chain bridging capabilities, with block time optimized from 5 seconds to 1 second. Celo announced its first batch of partners, including institutions such as Aave, Fireblocks, Uniswap, and Yellowcard. Under the new architecture, the role of existing Celo validators will shift to decentralized sorters, maintaining single block finality.